
Get 2023 Most Reliable SAP C_IBP_2208 Training Materials
The Realest Study Materials C_IBP_2208 Dumps
NEW QUESTION 45
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Periods are identified by an alphanumeric prefix and profiles by an integer.
- B. Both periods and profiles are identified by a unique integer.
- C. Both periods and profiles have start and end dates.
- D. Periods are identified by an integer and profiles by an alphanumeric prefix.
Answer: A,D
NEW QUESTION 46
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.
- A. Filter blocks are imposed when modeling an attribute as a key figure.
- B. Filter blocks can be visualized in the Key Figure Calculations app.
- C. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
- D. Filter blocks are imposed when modeling attribute transformations.
- E. Filter blocks are imposed when modeling cross-period calculations.
Answer: A,C,D
NEW QUESTION 47
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for a certain quantity of a key figure value.
- B. Fixing is possible for manually editable key figures.
- C. Fixing is possible for a certain period, including all child values in the hierarchy.
- D. Fixing is possible for system editable key figures.
Answer: C,D
NEW QUESTION 48
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. The name of the realignment step should be no longer than 20 characters.
- B. You must mark the realignment step as "shared" and assign the steps to users.
- C. A realignment step can change master data, planning objects and key figures.
- D. The number of steps in the realignment run is limited to 255.
Answer: B,C
NEW QUESTION 49
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Lot sizes are applicable for production and transportation quantities.
- B. Lot sizes are time-independent master data settings.
- C. Lot sizes are applicable for production and handling quantities.
- D. Periodic lot size setting overrides the minimum lot size.
Answer: B,C
NEW QUESTION 50
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.
- A. A special key figure marked as an aggregate key figure (aggregate constraint)
- B. A forecast metric key figure, such FCSTMAPE
- C. A currency conversion key figure, such as exchange rate
- D. A unit of measure key figure, such as UOMCONVERSIONFACTOR
Answer: A,D
NEW QUESTION 51
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.
- A. Disaggregation according to a user-defined expression
- B. Proportional disaggregation by using KF2 in the expression
- C. Disaggregation in batch triggered by an application job
- D. Disaggregation according to an equal split
- E. Disaggregation according to a helper key figure
Answer: A,B,D
NEW QUESTION 52
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID5" ="$$PERIODID5CU$$...)
- B. IF("PERIODID3" ="$$PERIODID3CU$$...)
- C. IF("PERIODID4" ="$$PERIODID4CU$$...)
- D. IF("PERIODID2" ="$$PERIODID2CU$$...)
Answer: C
NEW QUESTION 53
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.
- A. Create planning objects for new combinations in the app
- B. Enter the Phase-out Start Date and Phase-out End Date
- C. Enter the product family to which the new product belongs
- D. Copy the launch dimension from the reference product to the new product
Answer: A,D
NEW QUESTION 54
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Identifiy intermittent demand for Forecast Error CV calculations
- B. Propagate forecast error to upstream locations in a supply chain network
- C. Adjust Safety Stock Recommendations based on forecast error CV input
- D. Adjust for forecast bias in Forecast Error CV calculations
Answer: C,D
NEW QUESTION 55
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Adjusted production interactive values
- B. Production source validity at the start of seasonal peak
- C. Capacity expansion with additional costs
- D. Incremental production values
Answer: C
NEW QUESTION 56
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Finite and infinite heuristics
- B. Finite heuristics only
- C. Supply optimizer and supply heuristics
- D. Supply optimizer only
Answer: C
NEW QUESTION 57
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.
- A. The attribute belongs to a simple or compound master data type.
- B. The Business Meaning of the attribute has been specified.
- C. The attribute should be a non-key attribute of the master data type.
- D. The attribute should be assigned to all planning levels.
Answer: A,C
NEW QUESTION 58
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- B. This application job can be run for multiple time profiles at once.
- C. A time profile has to be activated so that the application job can proceed.
- D. The assigned Planning Area must be active.
Answer: A
NEW QUESTION 59
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.
- A. Use Excel Cell References in the Report Editor option is selected.
- B. Users should have authorization for template administration.
- C. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
- D. Activate Local Member Recognition setting is selected.
Answer: B,D
NEW QUESTION 60
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.
- A. Promotion Sales Lift Elimination
- B. Intermittency Detection and Correction in Sales History
- C. Bias Detection and Correction in Sales History
- D. Substitute Missing with Mean or Median in Sales History
Answer: A,D
NEW QUESTION 61
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a local member
- B. Using a appropriate period weight factor
- C. Using a key figure calculation
- D. Using a attribute as a key figure
Answer: B
NEW QUESTION 62
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Seasonal Chart Types
- B. Trend Chart Types
- C. Comparison Chart Types
- D. Geographic Chart Types
- E. Simulation Chart Types
Answer: A,B,C
NEW QUESTION 63
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Additional tiering costs (default) Maximum inventory
- B. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- C. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- D. Number of fair share segments Additional tiering costs (default) Inventory days of supply
Answer: B
NEW QUESTION 64
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.
- A. New instances of templates allow for re-use of the same processes.
- B. Each step depicted in the template can have tasks associated with it.
- C. The S&OP process step can be started with an application job.
- D. All process templates are assigned to dashboards.
Answer: A,B
NEW QUESTION 65
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- B. Key figures can be calculated across different planning levels.
- C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- D. The calculation chain for a key figure must always result in a calculated key figure.
Answer: B,C
NEW QUESTION 66
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
- A. Attributes
- B. Key figure type
- C. Scenario ID
- D. Modified date
- E. Reason code
Answer: A,D,E
NEW QUESTION 67
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Violation of minimum resource utilization
- B. Not respecting production capacity
- C. Not adhering to maximum transport values
- D. Violation of minimum aggregated inventory values
- E. Not-fully satisfied demands
Answer: A,D,E
NEW QUESTION 68
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.
- A. Supply chain graph in Supply Chain Network app
- B. Snapshot operator in the SAP IBP add-in for Microsoft Excel
- C. Planning view templates in the SAP IBP add-in for Microsoft Excel
- D. Jobs in the Applications Jobs app
Answer: C,D
NEW QUESTION 69
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Avoid using telescopic time buckets.
- B. Increase the use of incremental lot size beyond the frozen horizon.
- C. Split into multiple planning areas to support weekly vs. daily planning needs.
- D. Keep the number of fairshare segments small.
- E. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
Answer: A,C,E
NEW QUESTION 70
......
LATEST C_IBP_2208 Exam Practice Material: https://www.actual4labs.com/SAP/C_IBP_2208-actual-exam-dumps.html
New C_IBP_2208 Actual Exam Dumps, SAP Practice Test: https://drive.google.com/open?id=1Efff0U9y6MtTw-b3LqN-Zmz8SPrdA7qs