NEW QUESTION 76
Production planning problem typically has the following characteristics EXCEPT:

  • A. A time horizon of 12 months is used, with periodic updating perhaps every month or quarter
  • B. Production demand consists of one or a few product families or common units
  • C. Demand is rarely fluctuating
  • D. Plant and equipment are fixed within the time horizon

Answer: C

 

NEW QUESTION 77
It takes capacity planning to the next level of detail .The master production schedule is the primary information source. What is it?

  • A. Capacity requirement planning
  • B. Rough-out capacity planning
  • C. Resource planning
  • D. None of these

Answer: B

 

NEW QUESTION 78
When in a given period, actual demand will vary about the average demand, this is called:

  • A. Possible average variation
  • B. Fixed variation
  • C. Forecast variation
  • D. Random variation

Answer: D

 

NEW QUESTION 79
describes the function of the organization.

  • A. Mission statement
  • B. Service statement
  • C. Policy statement
  • D. Vision statement

Answer: A

 

NEW QUESTION 80
is difference between the total planned for a given period and the
actual total for that period.

  • A. Increasing rate
  • B. Collective concern
  • C. Total control rate
  • D. Cumulative variance

Answer: D

 

NEW QUESTION 81
One way to find out the capacity of a work center is to examine the information as the available capacity of the work center.

  • A. Utilization
  • B. Available inventory
  • C. Efficiency
  • D. Production records

Answer: D

 

NEW QUESTION 82
The advantage/s of production leveling is/are:

  • A. Firms do not need to hire and train workers and lay them off in slack periods
  • B. Firms do not need to have excess capacity to meet peak demand
  • C. It results in smooth level off operation that avoids the costs of changing production levels.
  • D. All of these

Answer: D

 

NEW QUESTION 83
Intermittent process layout is sometimes called product layout because the system is set up for a limited range of similar products.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 84
The capacity required depends on the particular mix of products being built and is difficult to predict is a characteristic of:

  • A. Intermittent manufacturing
  • B. process improvement
  • C. Streamline manufacturing
  • D. Periodic manufacturing

Answer: A

 

NEW QUESTION 85
Using non-cumulative methods, what is the ATP in period 1?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 86
The time a job waits at a work center before being handled is called:

  • A. Linger time
  • B. Interval time
  • C. Wait time
  • D. Queue time

Answer: D

 

NEW QUESTION 87
The elimination of all waste and continuous improvement of productivity is known as:

  • A. All of the above
  • B. Up-gradation manufacturing
  • C. Just-in-time manufacturing
  • D. Work-in-progress manufacturing

Answer: C

 

NEW QUESTION 88
Route sheet or a routing file gives information in the manufacturing of a product such as:

  • A. Sequence of operations
  • B. Operations required making the product
  • C. All of these
  • D. Equipment and accessories required

Answer: C

 

NEW QUESTION 89
A company wants to minimize the cost of manufacture and also be flexible enough to adapt to changing needs. Changes to production schedules can result in the following EXCEPT:

  • A. Cost increases due to rerouting, rescheduling, extra setups, expediting, and buildup of work-in-process inventory
  • B. Decreased customer service. A change in quantity of delivery can disrupt the schedule of other orders
  • C. Loss of credibility for the MPS and the planning process
  • D. Process create more scraps than needed than needed

Answer: D

 

NEW QUESTION 90
Over the time span of the production plan, large changes in capacity are usually not possible. Additions or subtractions in plant and equipment are impossible or very difficult to accomplish in this period. However, some changes can be done. Which of the following are out of those variations?

  • A. All of these
  • B. Work can be subcontracted or extra equipment leased
  • C. Inventory can be built up in slack periods and sold or used in periods of high demand.
  • D. People can be hired and laid off, overtime and short-time can be worked, and shifts can be added or removed.

Answer: A

 

NEW QUESTION 91
......


APICS CPIM Exam Syllabus Topics:

TopicDetails
Topic 1
  • Master Planning of Resources
Topic 2
  • Basics of Supply Chain Management
Topic 3
  • Strategic Management of Resources.

 

Tested Material Used To CPIM Test Engine: https://www.actual4labs.com/APICS/CPIM-actual-exam-dumps.html

Steps Necessary To Pass The CPIM Exam: https://drive.google.com/open?id=1BZnZQ20uspmtw5HkRzvl_gh7tkhrPz3k

 

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 )
From Monday to Saturday

Support: Contact now