SAP S/4HANA Asset Management Certification Exam Details:
| Exam Code | C_TS413_1909 |
| Schedule Exam | SAP Training |
| Exam Price | $550 (USD) |
| Level | Associate |
| Duration | 180 mins |
| Reference Books | S4130 (SAP S/4HANA 1909) S4133 (SAP S/4HANA 1909) S4132 (SAP S/4HANA 1909) S4131 (SAP S/4HANA 1909) S4130 (SAP S/4HANA 1809) S4133 (SAP S/4HANA 1809) S4131 (SAP S/4HANA 1809) S4132 (SAP S/4HANA 1809) |
| Number of Questions | 80 |
| Sample Questions | SAP S/4HANA Asset Management Certification Sample Questions |
| Exam Name | SAP Certified Application Associate - SAP S/4HANA Asset Management |
| Passing Score | C_TS413_1909 - 64% C_TS413_1809 - 60% |
NEW QUESTION 42
Which of the following types is supported out of the box in technical objects? choose 2 answers
- A. contractor
- B. maintenance plant
- C. organizational unit
- D. controller
Answer: B,C
NEW QUESTION 43
The installation locations for equipment in a technical system are documented in the ___________.
- A. Job List
- B. Measuring Points
- C. Usage List
- D. Equipment View
Answer: C
NEW QUESTION 44
How can you define the data transfer within a technical object hierarchy? choose 2 answers
- A. use the data origin function to the update the supported fields for the bill of materials
- B. use the data origin function to change the supproted for the piece of equipement
- C. use the reference functional locations for transfer data to the corresponding functional Icaotions
- D. use the data origin function to change the supported fields in the functional location
Answer: C,D
NEW QUESTION 45
You plan to use the integration of maintenance order and project system (PS) objects. to which PS objects can you assign a maintenance order? choose 2 answers
- A. network header
- B. network operation
- C. project definition
- D. WBS element
Answer: C,D
NEW QUESTION 46
What happens when you enter an invoice with reference to a purchase order?
- A. The system suggests data from the purchase order and the goods receipt.
- B. The system suggests data only from the purchase order.
- C. The system suggests data only from the goods receipt.
Answer: A
NEW QUESTION 47
Which options do you have to allow the assingment of order operation to object list entries. choose 3 answer
- A. to all object list entries
- B. to all task list
- C. to all maintenance plans
- D. only to notifiaction created via maintenance plans
- E. to all notification
Answer: A,D,E
NEW QUESTION 48
Which of the following are valid scheduling parameter in the multiple-counter plan? choose 2 answers
- A. Or-link
- B. call horizon
- C. schedule period
- D. start counter reading
Answer: A,C
NEW QUESTION 49
Which object combination influences the display of the fleet-specific tab strip and fields? choose 1 answer
- A. equipment category and fleet object type
- B. fleet object type and vehicle usage indicator
- C. fleet object type and measuring point category
- D. equipement category and measuring point category
Answer: A
NEW QUESTION 50
Which material are displayed when the planner check the availability list? choose 1 answer
- A. only the non-available stock material
- B. stock and non-stock material
- C. stock material and prodcution resources and tools material
- D. only the stock material
Answer: A
NEW QUESTION 51
Which of the following are checking instructions used to control availability checks?
- A. Checking rules
- B. Checking groups
- C. Checking profiles
- D. Checking types
Answer: A,B
NEW QUESTION 52
Which of the following processes (applications) are part of the production processes?
- A. Master production scheduling
- B. Material requirements planning
- C. Delivery processing
- D. Manufacturing execution
- E. Sales and Operations Planning
Answer: A,B,D,E
NEW QUESTION 53
What are the prerequisits to run SAP Work manager? choose 3 answers
- A. SAP Geographical enablement framework
- B. Sysbase unwired platform
- C. Mobile add-on for SAP S/4 HANA
- D. device operation system ( ios, andriod or windows )
- E. SAP mobile platform
Answer: C,D,E
NEW QUESTION 54
Which prerequiste do you require for SAP Asset manger? choose 2 answers
- A. SAP mobile platform
- B. SAP cloud platform
- C. mobile add-on for S/4hana
- D. mobile add-on for SAP ERP
Answer: B,C
NEW QUESTION 55
Which of the following areas are available in SAP S/4HANA?
- A. SuccessFactors Employee Central
- B. Concur
- C. Marketing
- D. Enterprise Management
Answer: C,D
NEW QUESTION 56
Which of the following are mandatory parameters for a counter used for performance-based maintenance planning? choose 2 answers
- A. code group
- B. characteristics
- C. estimated annual performance
- D. counter overflow reading
Answer: B,C
NEW QUESTION 57
A billing document can be created from what two types of documents?
- A. Sales order
- B. Inquiry
- C. Quotation
- D. Delivery
- E. Rebate list
Answer: A,D
NEW QUESTION 58
what is primary goal of sap perdictive maintenence and service? choose 1 answer
- A. to precalculate maintenance projects
- B. to provide advanced cost controlling analysis
- C. to create a cloud-based equipement directory
- D. to collect and analyze machine data
Answer: A
NEW QUESTION 59
Which of the following objects can you directly assign when you define the work center master record? choose
2 answers
- A. orgnaizational unit
- B. business partner
- C. calculation key
- D. capacity category
Answer: A,D
NEW QUESTION 60
At which level can the planner estimate costs in a maintenance order? choose 1 answer
- A. at the value category level
- B. at the component level
- C. at the work center level
- D. at the cost center level
Answer: A
NEW QUESTION 61
You create a revision for a maintance event builder (MEB) scenario. which objects can manually assign to a revision? choose 2 answers
- A. automatically created maintenance order from a maintenance plan
- B. automatically created notification from a maintenance plan
- C. manually created notifications
- D. manually created maintenance orders
Answer: B,C
NEW QUESTION 62
Which of the following statements about work centers are correct?
- A. They are only used in maintenance.
- B. They can be machine, production lines, or people.
- C. They are organizational units that define when and where an operation must beperformed.
- D. They form the basis for cost calculation, capacity planning, and scheduling.
Answer: B,C,D
NEW QUESTION 63
A maintenance planning plant...
- A. Is the organizational unit to which work centers are assigned
- B. Is only relevant for cross-plant planning
- C. Can be assigned to various maintenance plants
- D. Can only be assigned to one maintenance plant
Answer: C
NEW QUESTION 64
The maintenance engineer creates a single cycle plan with a cyle of 12 months and enters the scheduling indicator time-key date.
Which further scheduling parameter must you enter so that the calcuated call date is always scheduled six months before the planned date? choose 1 answer
- A. enter a tolarance of 50 %
- B. enter an offset of six months
- C. enter a scheduling period of six months
- D. enter a call horizon 50 %
Answer: D
NEW QUESTION 65
......