NEW QUESTION 16
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:
- A. You can find the optimal number of parallel R31oad processes by monitoring host performance.
- B. You can record the modification adjustment during migration and use the transports in the next runs.
- C. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
- D. You can verify that the content of the download directory matches the stack.XML file.
Answer: A,B
NEW QUESTION 17
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A. It explains the database migration option (DMO) of SUM.
- B. It is a database-specific document.
- C. It explains where to find information about the custom code analysis.
- D. It contains a section about the simplification item (SI) checks.
Answer: C,D
NEW QUESTION 18
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Move the R3trans update archive into the download folder
- B. Move the stack.xml update file into the download folder
- C. Extract the SAP HANA client installation archive
- D. Extract the SAP HANA database installation archive
- E. Move the SAPM update archive into the download folder
Answer: B,C,E
NEW QUESTION 19
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Upgrading to SAP ECC 6.08 without using DMO
- B. Using DMO when applying Support Packages to SAP ECC 6.07
- C. SAP S/4HANA conversion to SAP S/4HANA 1709
- D. Updating to SAP ECC 6.07 using DMO
Answer: A,C
NEW QUESTION 20
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It performs a comparison on selected tables using check sum.
- B. It performs a comparison on all tables using row counts.
- C. It does NOT perform any table comparison.
- D. It performs a comparison of all tables using check sum.
Answer: B
NEW QUESTION 21
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. A
- B. Target DB size will increase temporarily
- C. DMO can only be run with systems NW740 or NW731
Answer: B,C
NEW QUESTION 22
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- B. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- C. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- D. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
Answer: C
NEW QUESTION 23
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION 24
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It is a database-specific document
- B. It contains a section "free space requirements"
- C. It is target release specific
- D. It contains a troubleshooting section
Answer: B,C
NEW QUESTION 25
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- B. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- C. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
Answer: D
NEW QUESTION 26
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Configure it within transaction ATC
- B. Apply the corresponding SAP note via SAP Note Assistant
- C. Download it from SAP Support Portal
- D. Generate it by analyzing the specific custom code via RFC
Answer: C
NEW QUESTION 27
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
- A. Credentials of user DDIC in the development client of the development system
- B. Credentials of a named user in the development client of the development system
- C. Credentials of user DDIC in client 000 of the shadow system
- D. Credentials of a named user in client 000 of the shadow system
Answer: D
NEW QUESTION 28
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To make the progress information within SUM UI more accurate
- B. To skip selected phases during the SUM run
- C. To auto-fill specific fields on selected screens on the SUM UI
- D. To repeat specific phases during the SUM run
Answer: A
NEW QUESTION 29
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Near-Zero Downtime Maintenance (nZDM)
- B. Downtime Optimized DMO (DoDMO)
- C. Downtime Optimized Data Conversion (DoC)
- D. Near-Zero Downtime Technology (NZDT)
Answer: D
NEW QUESTION 30
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. Before continuing with the next phase SUM asks for a modification adjustment transport
- B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
- C. SUM continues with the next phase and your modifications are kept as In the start release
- D. SUM continues with the next phase and your modifications are lost
Answer: C
NEW QUESTION 31
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- D. You need to build up a SI check framework by applying SAP notes.
Answer: A,D
NEW QUESTION 32
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. Post-downtime
- B. During SPDD
- C. During uptime
- D. During downtime
Answer: A,C
NEW QUESTION 33
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SWPM using the Backup / Restore procedure
- B. SUM with DMO
- C. SWPM using the Load procedure
- D. SUM without DMO
Answer: C
NEW QUESTION 34
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase RUN_RSDBSCPY
- B. Phase RUN_RSPTBFIL _ISUTABU
- C. Phase DOWNCONF_DTTRANS
- D. Phases DIFF*
- E. Phases EU_IMPORT*
Answer: C,D,E
NEW QUESTION 35
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Check the compatibility of custom code with SAP S/4HANA
- B. Run the database migration to the SAP HANA database
- C. Perform the migration of data into the new data structure
- D. Apply the recommendations of the simplification list
Answer: A,D
NEW QUESTION 36
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_IMPORT_ALL
- B. EU_CLONE_MIG_SOT_RUN
- C. EU_CLONE_MIG_DT_CREATE
- D. EU_CLONE_MIG_DT_RUN
Answer: D
NEW QUESTION 37
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the database migration option (DMO) for SUM
- B. Using the main configuration option "Single System" in case of an upgrade.
- C. Using the main configuration option "Standard" when applying SAP Support Packages
- D. Using the main configuration option "Single System" when installing an Add-On
Answer: D