Financial consultants are vital in every industry that is concerned with manufacturing and supply chain management. The Microsoft MB-320 test is deliberate in getting potential candidates to focus on building their skills in the industry. Because of training and revision guides that have been made available, navigating through the demands of such an exam and the industry as a whole is much easier now. Although training is not obligatory, it is best to go through one even as you secure knowledge with the usage of study guides from Amazon.
NEW QUESTION 59
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished.
You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufac
NEW QUESTION 60
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
NEW QUESTION 61
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 62
A company implements manufacturing in Dynamics 365 Supply Chain Management.
The company wants to efficiently produce products comprised of different order types.
You need to select the appropriate production plan.
Which production process should you use for the production run?
- A. lean
- B. process
- C. mixed mode
- D. discrete
Answer: C
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-process-overview
NEW QUESTION 63
You are the lead product design manager at a Process manufacturing plant.
You are building a formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?
- A. Recycled
- B. Percent
- C. Per series
- D. Per quantity
Answer: A
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-recycled-products-in-formulas
NEW QUESTION 64
A manufacturer uses discreet orders and manually consumes raw material after reporting products as finished.
You are performing an end-of-month closing for remaining picking lists on production orders. You must not be required to consume the full amount of material on production order picking lists as a result of improved production efficiency. When the production manager verifies that no material is left to consume, there are remaining back-ordered amounts.
You need to pick the line item short and eliminate the remaining demand.
What should you do?
- A. Delete the item from the Bill of materials for the finished good.
- B. Enter the consumption amount on the line to match the actual amount used, and delete the remaining amount.
- C. Enter the consumption amount on the line to match the actual amount used and select end on the production order picking list.
- D. Change the Coverage group on item option to manual.
Answer: C
Explanation:
Section: Create, process, and manage production batch orders
NEW QUESTION 65
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 66
A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. No route
- B. No BOM
- C. No cost price
- D. No resources
- E. No consumption
Answer: C,D,E
NEW QUESTION 67
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 68
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 69
A company that uses discreet manufacturing concepts to produce solar panels has a temporary change of glass supplier. The substitute glass will only be used for three months. The company also uses Bill of materials (BOM) version to track changes of the raw materials.
Managers are manually adjusting the production picking lists to reflect the alternate glass that is being temporarily used. The time spent doing manual adjustments to production picking lists has become a burden.
You need to create a new BOM with the alternate glass and include a from and to date on the BOM version.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 70
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company. It is the end of the year and the labor rates have been recalculated based on new salary dat a. You need to update the effective labor costs for all labor groups.
Which element must be updated?
- A. resource group
- B. production orders
- C. cost groups
- D. cost category
- E. shared category
Answer: D
NEW QUESTION 71
You are a functional consultant for Contoso Entertainment System USA (USMF).
The factory of USMF has a shift that runs during the hours of 06:00 to 14:00 from Monday to Friday.
You plan to create a calendar that will use the shift.
You need to create the factory shift in the system.
To complete this task, sign in to Dynamics 365 portal.
Answer:
Explanation:
See explanation below.
Explanation
You need to configure a working time template to define the hours 06:00 to 14:00. Then you set up a working time calendar to define the working days. For this question, we just need to configure the working time template.
* Click Organization administration > Common > Calendars > Working time templates. Click New to create a new line.
* On the Overview tab, in the Working time template field, enter an alphanumeric identifier of up to 10 characters.
* In the Name field, enter a descriptive name for the template.
* Select the tab that corresponds to the day of the week that you want to define working hours for, and click Add to create a new line.
* In the From field, enter the starting time for the day or the period.
* In the To field, enter the ending time for the day or the period. This can be defined as a day, a shift, or a temporary stop in operation, such as a lunch period.
* In the Efficiency field, enter the efficiency percentage.
* In the Property field, select the property for the selected day's working time template.
* Repeat steps 4 through 8 for each day of the week.
NEW QUESTION 72
A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
NEW QUESTION 73
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 74
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012//restricted-products-item-by-country-or-state-form?redirected
NEW QUESTION 75
A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
NEW QUESTION 76
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
* Create a new item model group and select stocked product option.
* Assign the item model group and select the stocked product option (here it is selected in option one so no need to select).
* Add the service item to the BOM
NEW QUESTION 77
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/operation-sch
NEW QUESTION 78
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/batch-balanci
NEW QUESTION 79
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches.
The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 80
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean process. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
1.) Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01
2.) Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell
3.) Create a production flow process activity using the painting work cell and the service item as the picking activity
4.) Create a service term on the activity to tie the purchase agreement to the activity Does this solution meet the goal?
- A. No
- B. Yes
Answer: B
Explanation:
Section: Create and manage production and lean orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity- based-subcontracting
NEW QUESTION 81
A company manufactures automobile engines.
You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.
You need to translate production plans into Dynamics 365 Finance and Operations elements.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:

NEW QUESTION 82
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:
You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
- B. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned.
- C. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
- D. Review the calendar for the resource to determine if it is expired.
Answer: B,D
Explanation:
Section: Create and manage production and lean orders
NEW QUESTION 83
......